Hardware — Assembly

Assembly

Build order for the machine. Follow the sections top to bottom.

Order of operations

  1. Distribution — bin frame, top interface, and chute. The interface layer is built as part of distribution.
  2. Feeder — the C-channel stages that meter parts in.
  3. Electronics — boards, wiring, and steppers. Now its own section, alongside Assembly.
  4. Software setup — flash and configure. Hands off to the Sorter section.